When Little Caesars called, we answered. Their project involved the interior demolition of a 20,000 sq. ft. cold storage warehouse and distribution center, and we adapted to the cool temperatures with specialized equipment and personal gear.
Little Caesars Freezer Demolition


There When You Need Us
Little Caesars Cold Storage Warehouse needed some interior demolition before installing new freezer panel walls and renovating the overall warehouse. Quality Environmental, Inc. performed Demolition and Disposal of existing freezer panel walls, ceilings, existing metal support beams, metal railings, metal poles, and metal studs of approximately 20,000 sq. ft. Quality Environmental used scissor lifts, forklifts, plasma cutters, as well as 6 mil fire retardant poly walls for dust control for the duration of the project.