INTERIOR DEMOLITION OF 20,000 SQ. FT. COLD STORAGE WAREHOUSE AND DISTRIBUTION CENTER

  • Demolition and disposal of existing freezer panel walls and ceilings of approximately 20,000 sq. ft.
  • Demolition and disposal of existing metal support beams, metal railings, metal poles, and metal studs.

Quality Environmental used scissor lifts, forklifts, plasma cutters and other electrical equipment for the duration of the project.

Quality Environmental used 6 mil fire retardant poly walls for dust control for the duration of the project.