Lineages Freezer Ceiling Panel Demolition


Interior Demolition of approx. 3,500 sq. ft. in Below Zero Temperatures
- Demolition and disposal of existing freezer ceiling panels of approx. 3,500 sq. ft.
- Demolition and disposal of T-bar grid tracks.
- Protection of all fire sprinklers throughout demolition activities.
- Limited production due to working conditions at below-zero temperatures.
- Demolition and disposal of three 6-in. layers of fiberglass insulation of approx. 3,500 sq. ft. (frozen 1-3 layers)
- Because of the very low temperature, all Quality Environmental laborers wore proper freezer wear, including one-piece suits, beanies, face masks, gloves, and boots.